An interesting project where we delivered a full Design & Build service for our client, Covertex.

A 12,000 sq ft. warehouse extension, remodelling & modernisation of the existing building, including the construction of a new mezzanine office facility within the existing building.

Due to the requirement for the client’s business to remain in occupation and trading throughout the process, we needed to provide a phased solution that would allow us to deliver sections of the build quickly and efficiently, whilst minimising the disruption of the client’s day-to-day operations.

Through surveys, investigations and research of several different methods of construction in the early stages of the project, we established that the most suitable and efficient system was a Light Gauge Steel Frame solution, which is a Modern Method of Construction (MMC). The light nature of this system, off-site fabrication & speed of installation made this the best solution as we were able to minimise disruption to the client’s business, which was key to the brief and overall provided the most economical solution.

The light nature of this system and soil conditions also allowed us to design a sustainable screw pile solution rather than a traditional foundation. This saved a significant amount of time, risk on the ground & wastage.

To minimise errors & ensure the project was delivered successfully, 3D modelling & visuals were produced.