Installation shots from the site where the new mezzanine floor and roof structure were installed during the course of last week.
Utilising a SIP structural insulated panel solution, we have been able to manufacture off-site an extension to sit on a new ring beam installed within the walls of this existing property.
During the course of last week, the steels were placed on pad-stones, creating a fixing point for all of the panels. By the end of last week, the structure was completed, and we are now installing the windows and skylight.
Looking great and a fantastic solution.